Phase 3: Soil Decontamination and Remediation

A Phase 3 restores the property. Based on the Phase 2 results, we choose the decontamination method suited to the site, the contaminants and your deadlines, we supervise the work and we verify that the criteria are met.

Free quote
Two technicians in protective suits collecting soil samples near an excavator

Effective, compliant decontamination

  • A solution suited to your property

    Every contamination is unique: the plan accounts for the contaminants, their extent and the site constraints, to keep costs under control.

  • A project managed from start to finish

    Authorizations from the MELCCFP, supervision of excavation, transport and treatment, then follow-up after the work.

  • Proper certificates

    We produce the final reports and help you obtain the certificates of compliance that add value to your property.

Free quote

Why choose us

Our expertise at the service of your remediation

An effective, compliant intervention, for a lasting solution.

  • Choosing the method

    Excavation, on-site (in situ) or off-site (ex situ) treatment, containment: we compare the options based on the contaminants, the volumes and your goals.

  • Remediation plan

    Management of excavated soil, equipment, schedule of operations and safety measures, brought together in a detailed plan.

  • Supervision and control

    Our professionals supervise the work and collect confirmation samples to verify that MELCCFP criteria are met.

  • Reports and certificates

    Once the decontamination is validated, we write the required reports and support you through to the certificates of compliance.

Our 3-step approach to a clean site

  1. Step 1: Remediation plan

    Method, estimated budget and schedule set from the Phase 2 results, then the necessary authorizations are obtained.

  2. Step 2: Decontamination work

    Coordination and supervision of field operations, in compliance with safety and environmental standards.

  3. Step 3: Validation and compliance

    Post-work analyses, final report submitted to the MELCCFP and certificate of compliance for the site.

Technician in a white hard hat checking a tablet near an industrial building

Contact us

Your project, our complete expertise

Ready to start or need clarification? Talk to our specialists and receive a quote adapted to your situation.

Request a quote

FAQ

Frequently asked questions: Phase 3: Soil Decontamination

When is a Phase 3 needed?

When the Phase 2 confirmed soil or groundwater contamination above the regulatory criteria that apply to the use of the property.

What are the most common decontamination methods?

Excavation and transport of the soil to an authorized site, on-site treatment (for example biodegradation) and off-site treatment. The choice depends on the type and extent of the contamination.

How long does a decontamination project take?

From a few weeks to several months, depending on the complexity of the site, the chosen method and the extent of the contamination. We give you an accurate estimate after the initial assessment.

Have other questions? Contact us.